Batu Maung.
Aerial view of the two M Amaya towers rising above the Southbay coastline at Batu Maung

Penang · South-east shore

Batu Maung.

Where the island turns toward the sea.

M Amaya from the sea sideArtist's impression View photo

Batu Maung

The Second Bridge comes ashore here. The island's industrial heart begins here. A rail line and a new island are being built within five kilometres. This is where Penang's next decade is taking shape.

to the Penang Second Bridge
900mto the Penang Second Bridge
to the Bayan Lepas Free Industrial Zone
900mto the Bayan Lepas Free Industrial Zone
to the Mutiara Line's S02 station, under construction
4.6kmto the Mutiara Line's S02 station, under construction
to Penang International Airport
7.3kmto Penang International Airport

Distances as published by the developer, measured from Southbay.

Read the Batu Maung Atlas

The flagship at Southbay

M Amaya

Two freehold towers above the Penang strait.

Mah Sing's newest address at Southbay: 833 freehold homes in two 37-storey towers, a complete facilities deck on Level 8, and the Second Bridge on the horizon. Completion is targeted for 2030.

Tenure
FreeholdTenure
Homes in two towers
833Homes in two towers
Facilities on the Level 8 deck
41Facilities on the Level 8 deck
Completion targeted
2030Completion targeted
A single tower at full height. Thirty-seven storeys.Artist's impression

The residences

Five layouts. One to four bedrooms.

From a one-bedroom-and-study of 721 sq ft to four bedrooms at 1,432 sq ft. Every plan is published, every layout has its starting price — and Kevin will tell you plainly which one fits.

Compare all five layouts

Level 8

41 facilities. One deck. One view.

The pool, the gardens, the gym, the dining pavilions and the play areas share a single Level 8 podium — with a zen garden one level above.

The Level 8 podium, where the pool deck and the onsen jacuzzi sit together.Artist's impression

The Batu Maung Atlas

Know the place before you choose the home.

Eight chapters on Penang's south-east corner — what is here, what is being built, and who it suits. Drawn from open data and public sources, and dated.

  1. 01Where you areA working coast at the island's south-east tip.
  2. 02The crossingThe Second Bridge comes ashore 900 m away.
  3. 03The zoneHalf a century of Penang industry, next door.
  4. 04Getting aroundCar-led today. The train is on its way.
  5. 05Daily lifeThe school run, the weekly shop, the hospital.
  6. 06The decadeWhat opens between now and 2031.
  7. 07Who it suits, and who it doesn'tBuying the 2030s, deliberately.
  8. 08The flagshipM Amaya's place in the corner.

Map © OpenStreetMap contributors (ODbL 1.0). Relief: Copernicus DEM GLO-30 © DLR e.V. 2010–2014 and © Airbus Defence and Space GmbH 2014–2018, provided under COPERNICUS by the European Union and ESA.

The decade

What is here today. What is coming, and when.

Much of the case for Batu Maung lies in the 2030s. Here it is on one line: what is open, what is being built, and what is still only a target.

  1. 1972 The Bayan Lepas zone opens Widely recorded as Malaysia's first free trade zone, 900 m from Southbay. Open
  2. 2014 The Second Bridge opens 24 km to Batu Kawan on the mainland. Still Malaysia's longest bridge. Open
  3. 2023 Silicon Island reclamation begins About 133.5 ha reclaimed as at March 2026. Under construction
  4. 2025 Mutiara Line construction begins Ground broken January 2025; 8.99% built as at June 2026. Under construction
  5. Jun2028 Airport expansion Capacity from 6.5 to 12 million passengers a year, targeted June 2028. Targeted
  6. 2030 M Amaya completes The developer's target for 833 freehold homes at Southbay. Targeted
  7. 2031 Silicon Island, Phase One 513.95 ha, targeted by the state. Targeted
  8. Dec2031 The Mutiara Line opens Permatang Damar Laut (S02) is 4.6 km from Southbay. Targeted

Dates are those published by the bodies responsible. Targeted means targeted — the sale and purchase agreement carries M Amaya's binding date.

Independent analysis

What would it cost you each month?

A worked example on the smallest layout. Then change the price, the loan and the rate to your own.

Estimated monthly instalment
RM2,049Estimated monthly instalment
Maintenance, incl. sinking fund
RM238Maintenance, incl. sinking fund
Monthly rent that would cover both
RM2,287Monthly rent that would cover both

Worked example: Type A at its starting price, financed in full at 3.60% a year over 35 years. An illustration, not a bank offer — most banks lend up to 90% of the price for a first or second home.

Run your own numbers

Your property advisor

Kevin Lee

Kevin Lee · REN 14973 · FLP Realty Sdn Bhd · E(1) 1718

“Every decision my clients make, I take seriously.”

Independent new-launch advice for Batu Maung and M Amaya: layouts compared side by side, viewings arranged personally, and a straight answer when a layout isn't right for you.

  • English · 中文 · BMAdvice in the language you think in
  • REN 14973FLP Realty Sdn Bhd · E(1) 1718
  • Top Advisor of the Year 2019Titanium Award, FLP Realty

“可以感受到你是真心帮我们争取这间屋子,而不是为了卖而卖。”

TranslationWe could feel that you were genuinely fighting for this unit for us, rather than selling for the sake of selling.

Client · 2021

“Not the hard-sell type. Even after we paid our down payment he was still willing to assist us.”

Home buyer · 2019

From past clients' messages to Kevin about other projects — none concerns M Amaya. Names are withheld.

Questions

Five questions people ask about Batu Maung.

All M Amaya questions
What is Batu Maung known for?

Batu Maung is the south-eastern tip of Penang Island and still a working fishing coast — LKIM's fisheries complex, the national Fisheries Research Institute and WorldFish's headquarters are all here. It is known for the Second Bridge landing, the Penang War Museum on its hill, and its place next to the Bayan Lepas Free Industrial Zone.

How far is Batu Maung from the airport and George Town?

The developer's amenity sheet gives Penang International Airport at 7.3 km and Komtar / George Town at 17 km from Southbay. Drive times depend on the hour — tell Kevin yours and he'll give you real ones.

What is the LRT plan for Batu Maung?

The Mutiara Line will run about 29.7 km from Silicon Island to Komtar, with a sea link to Penang Sentral. Its nearest station to Batu Maung, Permatang Damar Laut (S02), is 4.6 km from Southbay. Ground was broken in January 2025, the line was 8.99% built as at June 2026, and opening is targeted for December 2031.

What is Penang Silicon Island?

Silicon Island is a new island being reclaimed off Permatang Damar Laut, about 4 km from Southbay. Work began in September 2023; about 133.5 hectares had been reclaimed as at March 2026, with Phase One of 513.95 hectares targeted for 2031. For now it is a reclamation under way, not a district.

Is Batu Maung freehold territory?

Tenure is a per-title question, not a district-wide one, so this site answers it per project rather than for Batu Maung as a whole. M Amaya is stated as freehold by its developer; any other property's tenure should be confirmed from its own title.

Speak to Kevin

Ask Kevin about Batu Maung and M Amaya.

WhatsApp is quickest. Or call, or leave a short note — Kevin replies personally, in English, Chinese or Bahasa Malaysia.

Kevin Lee

Kevin Lee · REN 14973 · FLP Realty Sdn Bhd · E(1) 1718

Kevin replies personally. Your details are never sold — the privacy notice says what he receives and why. Privacy notice

What would help most?

How should Kevin reply?

With the country code if you're outside Malaysia.

Add layouts, timing and a note (optional)
Layouts you're considering
Reply in
Buying for
When are you hoping to decide?

Please don't include IC, passport, bank or other personal documents — they're never needed at this stage.

No obligation. Your details are never sold.

Ask KevinWhatsApp · English, 中文, BM